The CMaR will provide preconstruction services with the intent of forming a Guaranteed Maximum Price (GMP) to assume the risk of delivering the project. The CMaR will be responsible for construction means and methods and will be required to solicit bids from prequalified subcontractors to perform the work using an approved subcontractor selection process. The CMaR may also compete to self-perform work. Such solicitation methods must comply with Iowa Code, Chapter 26A. Dallas County Adel EMS Station – RFQ CMaR Services Page 9 of 17 The County and selected CMaR will develop a detailed Scope of Work based on a robust preconstruction and progressive GMP process. The CMaR is expected to be able to provide necessary services for the Adel EMS Station project as described elsewhere in this document. The County does not guarantee a set amount of work or contract value for these services. A list of the anticipated services for each phase is provided below: Preconstruction Services will include, but are not necessarily limited to, the following: • Review documents for constructability, completeness, accuracy, and proper coordination of design disciplines. • Continually review documents to confirm conformance with the project budget. • Develop cost information and analysis to facilitate decision making. • Continually conduct a value analysis of the design to identify opportunities to reduce construction costs and/or to improve facility performance. • Advise County of ways to gain efficiencies in project delivery. • Develop a detailed phasing plan and construction schedule for the project, including identification of long lead items, off-site fabrication materials and County supplied equipment and materials. • Develop project implementation plans and site staging plans coordinated with County and for activities around and adjacent to the site. • Provide for construction phasing and scheduling that will minimize interruption to city streets, highways, and adjacent properties. • Develop detailed budget estimates at critical milestones. • Establish guaranteed maximum price (GMP) for work package(s) as identified by the Project Team (Owner, CMaR, and A/E).