Preconstruction Services: The CMAR will work with the Architect and the City during the design process to ensure the feasibility and constructability of the Recreation Center Locker Room Remodel Project. The CMAR will also be responsible for cost estimates during the Schematic (SD), the Design Development (DD), and the 95% Guaranteed Maximum Price (GMP) phases of the project. The CMAR will work with the Architect and City to ensure that the cost of construction of the Project is within the estimated Construction Budget through the selection of construction systems and materials, detailed CSI format cost estimating, scheduling, and other means. The CMAR will also review the project schedule and identify the critical path and long lead items. Upon the completion of the design development phase and prior to the completion of the 100% set of construction documents, the CMAR will submit a proposal of a Guaranteed Maximum Price (GMP) for the construction of the Project, which is within the Construction Budget of the City. Bidding Services: The CMAR will serve as General Contractor to complete all work for the bidding and construction of the project.