1. Pilot Knoll Park Improvements Phase 1 a. Replacing the existing gatehouse with a new 500 square foot gatehouse that serves as the entry control point and check-in station of the park. b. Entry road enhancements to the park area leading up to the gatehouse including parking, vehicular control gates, electronic pay station, and pedestrian access to the gatehouse. 2. Pilot Knoll Park Improvements Phase 2A a. Construction of up to 16 individual cabin sites to include gravel drives, parking, and individual recreational amenity areas. b. Cabin structures will be up to 400 square foot in size and will have utility connection tie-ins to water, sewer and electrical infrastructure. c. The water, sewer, and electrical utility upgrades are being provided by separate project and will be completed prior to cabin construction. d. Trail connections from cabin sites to other park use areas. e. Enhancements and electrical upgrades to shelters, pavilions and walkways in the day use area of the park. f. Enhancements to recreational amenities such as volleyball courts, covered picnic tables, grills, fire pits, and cornhole boards. 3. Pilot Knoll Park Improvements Phase 2B a. Expand the boat ramp parking lot for improved circulation and add additional parking at the boat ramp. b. Construct elevated boardwalks to connect to a new floating boat dock and kayak launch dock at the boat ramp. c. Upgrade lighting at boat dock to solar lighting.