Specifications include, but are not limited to: Network Equipment, Design and Technical Specifications. The Proposer must provide network architecture documentation that shows active equipment locations and where assets will be added. Network architecture should consider a redundant topology that provides resiliency in the network. While not every component of the network can be redundant, where feasible the Proposer should take steps to make service offerings as resilient as possible. It is expected that Proposer may have some preexisting core assets (fiber, towers, hut sites, etc.) they intend to utilize in providing services to the proposed service areas. Proposers utilizing pre-existing infrastructure should describe how these Assets fit into theirproposed network architecture. Network Test and Acceptance Standards The Proposer will be required to demonstrate network performance to specified test standards. These standards will need to be met for services offered and infrastructure built or contracted. Speeds will be tested and proven as negotiated in the contract. Test standards are outlined in Section 8. Presence in CITY While the successful Proposer will receive an RFP award letter from the CITY, the CITY has the option to request best and final offer to the Proposer. The Proposer will be contributing significant capital and operational Assets and shall demonstrate they can successfully deliver internet/broadband where the network is required to offer service. A significant component of the scoring criteria will be the CITY’s assessment of the Proposer's proposed presence within the CITY, demonstrating its ability to provide adequate service and support to its customers. Network Deployment Timing The CITY intends the project be deployed in a continuous fashion commencing immediately upon contract execution. The CITY desires that all Rural Internet Connectivity Project(s) be completed prior to September 30, 2023 preferably sooner, or by the negotiated date of the contract with the CITY. Within their RFP response, Proposer shall provide a proposed schedule for implementation that reflects the most expeditious timeline possible, including engineering, permitting, licensing, construction, and validation