Specifications include, but are not limited to: Well Description & Well Plugging RequirementsConrad Well # 3 Description & Well Plugging RequirementsTotal Depth estimated 700 feet blsCasing Diameter 12 inches from surface to 165 feet below land surface (bls)Open Hole Diameter 10.5 inches from 165 feet bls to 700 feet bls estimated.Well is obstructed at 555 feet blsWell bore shale be graveled to the top of the Edwards formation (estimated 60 feet to be graveled) and theremainder to the borehole shall be cemented to the surface via positive displacement.Water level 43.3 feet bls (1/12/2006)Elevation 939 feet mean sea levelEstimated top of the Edwards 640 feet blsFranklin Well # 2 Description & Well Plugging RequirementsTotal Depth - 285 feet bls estimatedCasing Diameter 16 inches from surface to 78 feet blsOpen Hole Diameter 26 inches from 78 feet bls to 82 feet bls and 10 inches from 82 feet bls to 203 feetbls estimated.Well is obstructed at 87 feet blsWell bore shale be graveled to the top of the Edwards formation and the remainder to the borehole shallbe cemented to the surface via positive displacement.Water level Dry hole (1/20/2012)Elevation 973 feet mean sea levelEstimated top of the Edwards 235 feet blsStraus Medina Well Description & Well Plugging RequirementsTotal Depth 1300 feet blsCasing Diameter 10 inches from surface to (900 estimated) feet below land surface (bls)Open Hole Diameter 8 inches (estimated) from (900 estimated) feet bls to 1300 feet blsWell is to be cleaned out to a minimum of 50 feet below bottom of the casing or if the contractorencounters solid undrilled formationWell bore shale be graveled to10 feet from the bottom of the casing filling the open Edwards formationand the remainder to the borehole shall be cemented to the surface via positive displacement.Water level 3 feet bls (7/17/2012)23.Execution of Work Measurement and Payment: Separate payment shall not be made to perform tasks and to covercosts associated with project administration, project management, regulatory requirements, quality control,meetings, reports, and submittals, as these shall be incidental costs. Separate payment will not be made tocoordinate with utility agencies, mobilize, demobilize and site restoration, clean-up, as these shall also be incidentalcosts. Include these costs in the well plugging cost items contained in the Price Schedule.Payment for each specified item described below contained in the Price Schedule will be made at the contract unitprice for that item. The scope of work includes acquisition of all permits, submittals, utility coordination, safety pre-cautions, use of proper equipment, labor, materials, tools, transportation and all other incidental costs necessary toplug each well in compliance with all applicable regulations, as well as contract specifications contained herein.Price Schedule Item Measurement, Payment and Work Description (Refer to Price Schedule):Item 1 Conrad Well # 3 located in Uvalde County shall be lump sum for full compensation for the completecleaning out of the well to a minimum of 150 feet below obstruction unless the contractor encounters solid undrilledformation, including but not limited to, all required administration, supervision, submittals, incidentals, labor,products, materials, tools, equipment, plant, transportation, disposal and fees, services, incidentals, shall be paidunder this unit price item