The selected Respondent(s) will be responsible for providing all necessary equipment including but not limited to computer, software, and cell phone as part of their overhead and without separate reimbursement. Activities for which building envelope services may be requested include any or all of the following: a. Design Phase • Participate in the design phase on an as-needed basis, bringing to the owner’s attention any potential design deficiencies that may be found at any point during the design phase. • Review design documents, drawings, and specifications for constructability. Provide review comments to the Owner within 10 business days. • Provide plan checking for conformance to applicable code requirements as well as FM Global requirements. For each major review, provide a report with diagrams showing alternatives for details deemed deficient. If Respondent attends a design review in which there are no, or very few envelope details, provide a report identifying the locations which may be problematic.