The work under this contract includes furnishing all labor, tools, material, and equipment, an for performing all work necessary for reconstruction of: 8”, 10”, and 12” water main, 8” pressure rated sewer main, and asphalt pavement rehabilitation. Work also includes the installation of proposed pipes by open cut, directional drill, and bore, concrete curb and gutter, fire hydrants, and any other work deemed necessary by the City of Cedar Hill. All of the above shall be done in accordance with NCTCOG specifications, with the City of Cedar Hill’s Addenda and as per instructions of the OWNER. All construction sequencing and barricading will be done according to the City of Cedar Hill Standards and Details and TxDOT’s Manual for Uniform Traffic Control Devices (MUTCD), unless work occurs within TxDOT ROW, in which case TxDOT standards will apply.