Specifications include, but are not limited to: Port Arthur Transit (PAT) is soliciting proposals to furnish all labor and materials required to design and construct bus stops, and install shelters at various locations throughout PAT’s service area. Work includes, but is not limited to transporting and installing shelters and amenities; and constructing all site work required for bus stops and amenities, and to provide ADA access to stops. PAT anticipates to construct 20 to 30 bus stops per year over the 3-year life of this contract. The contract may be utilized to address additional bus stop/sidewalk related items upon PAT’s discretion.PAT’s standard bus stop features a 10’ x 15’or 10’ x 30’ concrete pad, with accessible connections for pedestrians traveling to and from the stop, a shelter and/or bench, bike loop and trash can. Major bus stops, such as a transit hub, often feature full electrical and communications, with additional shelters, and other amenities. Some stops may require signalization work to connect fiber and equipment to existing or new traffic control cabinets.