Specifications include, but are not limited to:The work to be performed under this contract consists of: Clean, prepare and paint both interior and exterior surface of the tank, along with all site associated valves and piping. This 150,000 gallon tank is located on 903 Toepperwein Road in Converse, Texas. 1. Surface preparation the interior and exterior of Elevated Storage Tank (150,000 gallons) located in Converse, Texas. 2. Furnish all materials, equipment, supplies and accessories required associated with the work specified herein. 3. Obtain all permits necessary to complete the surface preparation and coatings work designed for this project, including removal, handling and disposal of used abrasive, hazardous and/or toxic waste materials. For blasting and painting water storage tanks, the contractor shall perform work in compliance with Title 31, Natural Resources and Conservation Part III, Texas Air Control Board Chapter III, Control of Air Pollution from visible Emissions and Particulate Matter Abrasive Blasting of Water Storage Tanks Performed by Portable Operations, 31 TAC 111.131 through 139, latest revisions. 4. Use non-lead containing coatings which comply with all laws, regulations and ordinances of the Federal, State, and Local government including V.O.C. regulations. 5. Specification covers the surface preparation and painting of all surfaces, both interior and exterior, except as otherwise specified or specifically excluded. 6. Protect all adjacent work, vehicular traffic, property and persons from damage, e.g., over spray, over blast and spillage. Should damage occur, THE CONTRACTOR SHALL make provisions for repair of damage in a timely manner at his/her expense. 7. Properly store and handle materials according to manufacturer's requirements and in compliance with applicable government regulations. 8. Provide scaffolding, ladders, lighting and equipment as necessary to accomplish work and to provide safe access for inspection by the City of Converse or its designated representative. All operations, equipment and their installations shall comply with all applicable laws, regulations and ordinances. Compliance with OSHA Standards per 29 CFR 1926 and 29 CFR 1910 is to be enforced by the Contractor. 9. Provide for the safety of all personnel, including but not limited to the use of explosion proof lighting and proper electrical grounding of equipment. Handling and application of all coating materials shall be in accordance with the manufacturers’ latest material safety data sheets (MSDS) and/or product data sheets. 10. Remove the tank name plate, clean the face of the plate, clean and repaint the area behind the plate, then remount it. 11. Clean, remove and dispose of sediment and debris from the interior of the water tank.