Specifications include, but are not limited to:This project is being funded 90% by Federal Aviation Administration AIP funds and 10% by the City of Corpus Christi Funds. A. The base bid for this project consists of the following: 1. Approximately 35,000 LF of Fence Removal 2. Approximately 34,000 LF of 8-foot three strand barbed wire chain-link fence construction 3. Construction of 6 gates with linear induction gate operators, CCTV, and access controls 4. Construction of Fiber Optic Infrastructure for Gates 5. Various electrical Improvements to the existing security system 6. Pavement reconstruction of 3 concrete drives B. Additive Alternate I for this project consists of the following: 1. Approximately 5,500 LF of additional 8-foot three strand barbed wire chain-link fence construction C. Additive Alternate II for this project consists of the following: 1. Approximately 7,000 LF of additional 8-foot three strand barbed wire chain-link fence construction D. Additive Alternate III for this project consists of the following: 1. Construction of an Additional gate with linear induction gate operator, CCTV, and access controls E. Additive Alternate IV for this project consists of the following: 1. Construction of an Additional gate with linear induction gate operator, CCTV, and access controls