Scope: Provide engineering and design services, including construction administration, to: 1. Rehabilitate Runway 17/35 2. Rehabilitate Runway17/35 Parallel Taxiway and runway connectors. Preliminary Report Phase • Attend pre-design conference • Obtain and analyze necessary survey data • Obtain and analyze necessary geotechnical data • Prepare comprehensive report Preliminary Design Phase • Attend project meeting(s) • Prepare project drawings (70%) • Provide all technical specifications • Provide project cost estimate Final Design Phase • Attend project meeting(s) • Finalize drawings and contract documents (100%) • Provide a revised opinion of probable total project costs • Prepare a Construction Management Plan • Update, if necessary, the Preliminary Report • Prepare and submit airspace study to FAA