• Apply appropriate FAA Advisory Circulars (AC), Orders, and other Airport and regulatory guidance documents as required throughout project duration, to include but is not limited to: o Update aviation forecasts for pavement design, if required, o Design of airfield pavement, drainage, embankment, grading, and associated work, o Design of airfield electrical circuitry, regulators, and associated work, o Design of airfield pavement marking and guidance signs, o Design of FAA-owned facilities (including ALS and other Navaids) and other utility relocation, o Design of temporary and permanent fencing and security systems for AOA access, o Prepare and develop design and construction documents, • In collaboration with the CMAR contractor: o Develop overall construction sequencing and packaging strategy, o Identify phasing and sequence impacts per phase of work and develop proposed mitigations, o Prepare cost estimates and schedules, o Prepare construction solicitation front-end documents and coordinate with City and Airport staff as directed to meet solicitation schedules and FAA grant application requirements.