- Locating existing utilities - Coordinating with Contractors working adjacent to the project limits. - Videotaping of work site prior to construction - Contractor negotiations with property owners for temporary staging areas - Construction staking - Preservation and protection of plant materials and trees, unless specified otherwise on the plans on a case by case basis. - Removing brush and trees smaller than 6’. - Additional Barricades and Traffic Control Devices within the project limits to maintain traffic safety - Removing asphalt detour pavement - Repairing asphalt detour pavement - Cutting and plugging existing utility lines to be abandoned - Removal of existing lines in any location or in proposed trench lines - Adjusting water valve stacks, meters, sanitary sewer cleanouts to finished grades - Maintaining positive drainage during all construction phases - Removing valves and fittings - Coordinating with KCS and TxDOT on work in their ROW. - Substituting 5” of nonreinforced concrete for the asphalt detours. - Concrete curb is incidental to concrete pavement. - Field adjusting locations of taps, connections, manholes, junction boxes, driveways, ramps, sidewalks, signs, and other miscellaneous appurtenances due to site changes occurring after bidding of plans. - Painting of steel railings - All fees, unless stated otherwise is this contract - Repairs to driveways, fences, walls, landscaping, irrigation and other private property that is avoidable, caused by the Contractor and not approved in writing by the City. - Field Office - Removing erosion control devices - Final cleanup