Specifications include, but are not limited to: 1) Perform 5-year Internal Inspection. a) Building A System 1 b) Building B System 3 2) Replace Expired Gauges. a) Building A System 1 (4) Gauges. b) Building B System 2&3 (4) Gauges. 3) Replace defective water gong. Building B system 3. 4) Add Sprinkler heads. a) IDF Room 2nd floor storage room. (1) b) Welding Room under exhaust manifold for proper coverage (1) c) Main Shop preventive maintenance under 4’ wide duct work X 40’ long duct. (4) d) Bay #3 under 4’ duct work. (3) e) Tire Shop under 4’duct work (3) 5) Replace Sprinkler Heads loaded and corroded. a) Compressor Room (4) b) Stairs at Storage Room (1) 6) Plug Off Sprinkler Heads. a) Bay 2,3,14,15,19,20,22,23 (2) b) Bay 9 Sidewall head (1) c) Bay 11 (1)