Specifications include, but are not limited to: Phase III of a 3 phase project and will not be a standalone project but an expansion of Phase I, II, and IIa. Since there will be some interconnect of equipment all equipment must be compatible with the Phase I and II equipment. Phase III equipment shall be integrated and monitored by the Deck Monitoring System (Alsoenergy, Inc.) that was installed in Phase I, II and IIa. The Phase III equipment will also be required to be connected to a Battery Storage Unit and Micro-Grid Controller provided by the Electric Power Board (EPB) that will connect Phase I, II, IIa, and III. All PV panels shall have anti-reflective/glare coatings to reduce reflectivity. The Phase III installer will coordinate with the Phase I, II, and IIa equipment manufacturers to ensure that equipment warranties remain in effect for each piece of equipment that is interconnected.