Specifications include, but are not limited to: Installation of a 2-Pole Musco ballfield lighting system City to provide all necessary materials for installation; A. The installing contractor shall bc rcsponsiblc for providing thc equipment and installation of a complete and operational system commencing from the secondary side of the service transformer and terminating at the safety disconnect within the electrical enclosure, 10'above grade, on each lighting pole. The electrical contractor shall coordinate the transformer and switchgear locations, as well as identifuing the voltage and phase of the service, with the local power company and the Owner's representative before any equipment is installed. B. Electric Power Requirements for Sports Lighting Equipment as per Musco Lighting specifi cations