Specifications include, but are not limited to: Remediation of three ponds located in the Mapleridge Subdivision. POND A, Located at 4241 Homewood Road Sediment obstructing both headwalls must be removed and positive drainage toward the outlet structure must be restored. Supply and install trash rack as specified in the plans. Two existing orifices in the outlet structure must be patched with brick and mortar as specified in the plans. One new orifice will need to be cored/installed as specified in the plans. Install grout invert into bottom of outlet structure to prevent ponding. POND B, Located at 1723 Maplestone Lane Adjust the top elevation of the structure as specified in the plans. Supply and install trash rack as specified in the plans. Patch three orifices in outlet structure with brick and grout as specified in plans. Two new orifices will need to be cored/installed as specified in the plans. Raise the pond berm as specified in plans. Install grout invert into bottom of outlet structure to prevent ponding. POND C, Located at 1736 Maplestone Lane Sediment obstructing the headwall must be removed and positive drainage toward the outlet structure must be restored. One existing orifice in the outlet structure must be patched with brick and mortar as specified in the plans. Two new orifices will need to be cored/installed as specified in the plans. Adjust the top elevation of the structure as specified in the plans. Supply and install trash rack as specified in the plans. Raise the pond berm as specified in plans. Install grout invert into bottom of outlet structure to prevent ponding.