Specifications include, but are not limited to: Contractor will be responsible for removing the existing floor tile and adhesive throughout the building. Demolishing interior walls required to accommodate the proposed new floor plan (see attached facility plan). The former store entrance will be closed off and will become storage. The new building access will be on the left side of the building as indicated on the attached Drawings. Office areas will receive floor finishes (tbd), acoustical ceilings and other finishes associated with finished spaces. The existing overheaddoors will be replaced with new insulated doors (see the attached Design and Construction Guidelines). New LED lighting throughout the facility as well as new rooftop HVAC units to control climate in all areas of the building. New building access sidewalks and ramps are to be code compliant with all appropriate ADA requirements.