Specifications include, but are not limited to: The work to be performed under this contract consists of the following: The contractor is responsible for all applicable fees and permits associated with this contract including, but not limited to fees at waste disposal facilities. The contractor shall install and maintain all EP & SC measures as per the current TDEC sediment and erosion control manual. The contractor shall remove and properly dispose of all asbestos containing material (ACM) in an asbestos approved sanitary landfill. The contractor shall remove and dispose of as required by applicable laws other hazardous materials at the site. The contactor shall demolish, remove, and properly dispose in a permitted waste disposal facility both houses and associated structures (foundations, floor slabs, driveways, steps, walk-ways, ramps, etc.). Salvaging of the site’s contents will be allowed and recycling is encouraged.