Specifications include, but are not limited to: Total Base Bid, J0008249 - Contractor will provide all labor, all materials not furnished by the OWNER (See Estimate # 426314 for a complete list of materials to be provided by OWNER), equipment and incidentals as required to install underground electric distribution improvements to include one (1), two (2), or three (3) underground electric conduit(s) with associated transformer pads, transformers, underground cable, hand holes, associated fittings, abandon existing facilities, etc. and other improvements as detailed. CONTRACTOR shall trim/remove vegetation around pad mounted transformers per KUB Standards. Extent of the Work is shown on KUB Drawing(s) numbered C-10451. The CONTRACTOR shall supply all other incidental items necessary to complete the Work. The CONTRACTOR shall further provide and implement a traffic control plan and CONTRACTOR shall provide all labor, equipment, materials, and incidentals as required to repair landscaping, streets, curbs, driveways, etc., as necessitated by the performance of the Work. Contractor must contact the Electical Inspector at 865-558-2786 three (3) days in advance of work to arrange for inspections.