The Contractor must provide all equipment, labor, supervision and supplies necessary to perform the types of work specified in this Request for Quotation. 6.2 The Contractor must be capable of performing services such as tree fertilization, pruning, felling, stump grinding, wood chipping, and other related work on an as-needed basis. 6.3 Tennessee Tech will coordinate jobs together as efficiently as possible to minimize setup cost. All work must be coordinated with the Facilities Grounds Manager. 6.4 Contractor must check in daily with the designated Tennessee Tech point of contact (POC) to discuss staffing and project status. Additionally, coordinate with TTU POC in advance when performing any work before or outside of regular business hours. 6.5 While work is being performed, the Contractor shall ensure that public areas are kept clean and protected from damage at all times. The Contractor will be responsible for protection of Tennessee Tech property and must repair any damage caused during the work at Contractor’s expense.