105-01 CONSTRUCTION STAKES, LINES AND GRADES (1) LS 201-01 CLEARING AND GRUBBING (1) LS 202-01.13 REMOVAL OF PIPE (SIZE ,STA.) (24", DITTY 20+45.00) 45.000 L.F. 202-01.14 REMOVAL OF PIPE (SIZE, STA.) (24", DITTY 22+76.00) 46.000 L.F. 202-01.15 REMOVAL OF PIPE (SIZE, STA.) (48", DITTY 25+93.00) 53.000 L.F. 202-02.01 REMOVAL OF PIPE (SIZE ,STA.) (12" ,BAXTER 101+40) 33.000 L.F. 202-02.02 REMOVAL OF PIPE (SIZE ,STA.) (12" , BAXTER 102+00) 27.000 L.F. 202-02.03 REMOVAL OF PIPE (SIZE ,STA.) (18" , BAXTER 106+00) 30.000 L.F. 202-02.04 REMOVAL OF PIPE (SIZE ,STA.) (12" , DITTY 26+84) 21.000 L.F. 202-02.05 REMOVAL OF PIPE (SIZE ,STA.) (18", DITTY 30+04) 40.000 L.F. 202-02.06 REMOVAL OF PIPE (SIZE ,STA.) (12" ,DITTY 30+52) 20.000 L.F. 202-08.10 REMOVAL OF CURB (DESCRIPTION) (TRACT 14 DRIVEWAY) 62.000 L.F. 203-01 ROAD & DRAINAGE EXCAVATION (UNCLASSIFIED) 68,482.000 C.Y. 203-02.01 BORROW EXCAVATION (GRADED SOLID ROCK) 30,600.000 TON 203-04 PLACING AND SPREADING TOPSOIL 3,706.000 C.Y. 203-06 WATER 57.000 M.G. 203-07 FURNISHING & SPREADING TOPSOIL 486.000 C.Y. 203-20.01 CHANNEL SUBSTRATE 165.000 C.Y.