1. The Contractor shall provide TSD a rendering of the project for approval. 2. The Contractor shall remove and dispose of the existing playground and install a new playground in the area identified on Attachment A – Site Overview. a. The Contractor shall make the new site fully ADA compliant, including but not limited to, wheelchair accessibility. 3. The new playground shall be composed, at minimum, of the following items: a. Custom play system with similar use zone, comparable quality, and material of construction, and containing, at a minimum, the features present in Playcraft Systems structure R507D3EEA (Attachment B – Playcraft Structure Specs). b. Swing system with a minimum of five (5) swings, at least one (1) swing to be an inclusive style with seatbelt harness. Sizes should be appropriate for K-6 grade age students (Attachment C – Swings). c. Three (3) 6’ benches with backs and in-ground mount (Attachment D – Benches). 4. The Contractor shall install new unitary ethylene propylene diene terpolymer (“EPDM”) poured in place rubber safety surface over the new playground location (approximately 3,550 square feet). a. Allsitework, including ensuring ADA accessibility for wheelchairs and individuals with disabilities. b. The Contractor shall provide and include all required materials, including all substrate materials (this includes crushed stone and soil, as needed) as part of this bid.