The Project includes the following Work: Contract #01: Sanitary Sewer System Rehabilitation Rehabilitation of approximately 12,419 LF of gravity sewer pipe by CIPP, pipe bursting, or open-cut methods. Rehabilitation by lining, of approximately 70 manholes and the wet well for the South Main Lift Station. Work includes all one calls, pipe lining, lateral grouting, all bypass pumping, temporary traffic control, and all other associated work. Contract #02: Television Inspection, Smoke Testing of Sewers, and Flow Meter Installations Television inspection and smoke testing of approximately 99,174 LF of gravity sewer and 372 manholes. Work will include all CCTV, all one calls, bypass pumping, root / debris removal as necessary, temporary traffic control, installation of up to ten (10) area-velocity meters for open channel flow (in a permanent configuration) along with rain gauges and any other associated work. Contract #03: Television Inspection, Smoke Testing of Sewers, and Flow Meter Installations Television inspection and smoke testing of approximately 64,562 LF of gravity sewer and 319 manholes. Work will include all CCTV, all one calls, bypass pumping, root / debris removal as necessary, temporary traffic control, installation of up to ten (10) area-velocity meters for open channel flow (in a permanent configuration) along with rain gauges and any other associated work. The Project has an expected duration of: Contract #1: 120 days for Substantial Completion / 150 days for Final Completion Contract #2: 120 days for Substantial Completion / 150 days for Final Completion Contract #3: 120 days for Substantial Completion / 150 days for Final Completion Note: The Notice to Proceed for all contracts is expected to be before July 1, 2025