The work shall consist of installation, monitoring and testing of compaction grouting within the limits indicated on drawings to meet the acceptance criteria of these specifications. 4.5.2 In connection with the compaction grouting program, as shown on the drawings, the grouting contractor shall provide all labor, materials and equipment to accomplish the following items of work: 1. Implement ground/structure movement monitoring system. 2. Install and remove grout pipes. 3. Furnish and inject compaction grout. 4. Monitor surface ground/ structure movements during compaction grouting operations. 5. Follow compaction grouting sequence of operations. 4.5.3 It shall be the grouting contractor’s responsibility to determine and implement the systems and criteria to ensure that specified improvement is achieved.