Specifications include, but are not limited to: The Memphis Housing Authority is requesting a quote to Install an Access Control System to limit Access at Barry Tower and Jefferson Square Apts. The contractor is responsible for any demo and/or repairs needed to complete the Installation of the Access Control System and Hardware. The contractor shall be responsible for any subcontractors needed to complete said work. The contractor shall follow the construction drawings and specification for a turnkey project. MHA requires, that all potential bidders visit the job site to assess the existing condition and provide a cost for a complete job. MHA reserves the right to award this project in its entirety, partial, or not at all.