Specifications include, but are not limited to: This specification covers the regular and systematic treatment of the campus, the Fort Campbell Center and AP Farm for all insects and bugs including, but not limited to ants, roaches, crickets, spiders (Including brown recluse), silverfish, rats, mice, bed bugs, fleas and other flying and non-flying insects, and termite inspections and treatment. Initial treatment of all buildings should be completed within 45 days of the award of the contract. Treatment in all buildings includes every room, bathroom, hallway, mechanical room, and the exterior of the building, per attached building list. Find and eradicate any insect problem around the outside of the building that causes an interior infestation. The contractor is required to check in at the Physical Plant between 8:00 am & 4:00 pm, to pick up keys, and turn keys in after each visit., Contractor will be required to wear a uniform and have ID, with the company Identification. Contractor's vehicle will need to have identification on the vehicle: All employees will need to pass a background check. All buildings will be treated at least twice a year. Resident Halls should be treated once over the Summer and once during Christmas break. Some buildings may require quarterly treatment on an "as needed" basis, The Library and Sexton buildings require monthly treatment on a Saturday, Contractor will be required to leave a notice of service with description of areas treated in the Residence Halls on the day of service. This notice will give information on how rooms were treated for chemical sensitive students/staff. Residence Halls can be treated between 9:00 am, and 400 pm. Administration buildings can be treated between 8:00 am: and 4:00 pm, Contractor is to provide the University a proposed list of methods of treatments that will be used in pest control such as "gels, sprays, liquids, baits, dusty and chemicals. Contractor must able to change chemicals if allergic reactions or odors are reported. Contractor will provide the proposed methods to be used for treatment on each type of pest provided but not limited to the ones listed above, Contractor will be required to check in every day to handle any and all requests, All requests should be handled within 24 hours of notification by the University, excluding weekends or holidays, Contractor will be required to inspect all buildings yearly for termites and seek prior approval to treat as needed, Yearly inspections of all buildings will be conducted in January or February of each year, Contractor will notify us prior to any work being done, it the work will incur an afterhours charge. Approval must be obtained advance.