621-26-100 - Replace Electrical Switchgear Bldg. 208 Statement of Work From Specification Section 01 00 00: 1.2 GENERAL INTENTION A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for the replacement of the medium voltage switchgear and paralleling controls in building 208 as required by the drawings and specifications. 1.3 STATEMENT OF BID ITEM(S) BASE BID: Work includes general construction, alterations, and necessary removal of existing equipment and construction for the replacement of the medium voltage switchgear and paralleling controls in building 208. The period of performance is 365 days.