Specifications include, but are not limited to: Designer shall coordinate all disciplines of the design and process to compressively satisfy the scopeof the project. This includes best practices required for upgrading the existing interior sliding gates,coordinating structural engineers for Sally Port upgrades, proper conduit for pathways, andProgrammable Logic Controller (PLC) upgrades for the existing interior sliding gates. A RegisteredCommunications Distribution Designer (RCDD) will be required specializing in designing necessaryfiber installation for data drops, cameras, and switching equipment. A firm specializing in videosystem design, preferably a Certified Security Consultant, will be required to design the expansion ofthe existing Video Management System, camera upgrades, new camera locations, and overall systemcoordination with other design teams including Division 26 and Division 27.