The Town of Ashland City, an Equal Opportunity, Affirmative Action Employer, seeks to retain the services of a professional consultant engineering firm to provide services related to construction of the Cumberland River Bicentennial Trail - Phase 2 Project. This project will extend the Bicentennial trail (parallel to Vine Street, From Mulberry Street to Tennessee Waltz Parkway) and allow for safe pedestrian crossing. The trail extension will convert 2800-feet of rail bed to a hard surfaced 10-foot ADA compliant pedestrian use only path that will provide linear connectivity to the existing trail crossing TN-455/TN Waltz Parkway. The project shall be accomplished in accordance with TDOT Local Programs guidelines. The professional consultant engineering consulting firm must be on TDOT’s pre-approved list or have a completed pre-qualification form filed with TDOT by the deadline for the Letters of Interest.