Minimum wall sheeting to be 26 gauge, and a minimum roof sheeting to be 24 gauge with a 30-year warranty. Colors for the metal siding, roof, and trim to be determined. Standing seam roof. Roof areas to have a minimum 3:12 pitch. The proposed building including the insulation, windows, doors, etc. to meet or exceed the International Energy Conservation Code (IECC), 2018 Edition (see exceptions adopted by Cumberland County - https://cumberlandcountytn.gov/directory/codes/ ) No insulation to be placed above and on the ceiling tiles. Concrete floor thickness 6 inches with 6x6 Mesh w2.9xw2.9 reinforcing and 10 mil polyethylene vapor barrier. Four 36-inch walk through doors in Maintenance/Shop area with minimum 5 foot by 5 foot concrete pad. Two Overhead Doors on each side wall leaving Maintenance/Shop area, 14’ wide x 16’ height – Sectional Type Doors in Base Bid - Additive Alternative 1 – Roll-Up Doors One Overhead Door on back wall leaving Maintenance/Shop Building, 10’ wide x 12’ height – Sectional Type Doors in Base Bid - Additive Alternative 1 – Roll-Up Doors Remote Control for Overhead Doors A minimum two-foot concrete strip around the perimeter of the building where needed (not needed where apron and sidewalk are adjacent to the building) All gutter downspouts shall drain into 6” PVC downspout leaders extended 5’ feet out from building, floor drain pipe to extend 5’ out from building. City to continuing running the drains out from the building. All interior doors to be 36 inches wide, with lever door hardware, and door stops. All trenches for pipes and conduits across the parking area to be backfilled with gravel. All material excavated for foundations and trenched to remain on site and to be stockpiled on the back side of the project site. Contractor responsible for minor grading on the building site for concrete flat work. Contractor responsible for pipe bollards as shown on the concept plans. (Min. 4” steel pipe filled with concrete, 42” high, embedded 18” into 18” diameter concrete base, 60” length of pipe, painted yellow) The building design and construction shall be in strict accordance with the latest applicable codes and standards. City to review and approve all drawings and shop drawings, and review product information on equipment and accessories and approve. TEMPORARY FACILITIES The Contractor shall provide a temporary field office, sanitation facilities and equipment required during the duration of the project. The Contractor shall provide a dumpster as required for the project. The Contractor shall provide and be responsible for temporary electrical, gas and water services while the work is in progress. PERMITS / TAP FEES The Contractor is responsible for the building permit and the building permit fee in this proposal.