The project consists of the construction of 1 box hangar building and 2 T-hangar buildings. The buildings are pre-engineered building systems and have vertical lift bifold doors. The occupation of the buildings will be Group III aircraft hangars for the storage of aircraft and have no doping, hot work, fuel transfer/storage or spray finishing operations permitted within. The end of one building will be finished out for a break area complete with bathroom facilities which are accessories to the S-1 Storage occupancy. The scope encompasses sitework, erosion control, drainage installation, pavement installation, connection of 6 edge lights, pavement markings, utility service connections, turfing and other related work as shown on the drawings and/or in the specifications.