Specifications include, but are not limited to: The work for this project includes providing a cured-in-place pipe (CIPP) liner to stabilize structural defects and constructional inadequacies in sanitary sewer lateral pipelines. The liner shall be smooth, hard, strong, and chemically inert. Work to be performed under this contract described subsequently herein shall include materials, labor, equipment, and services necessary for: bypass pumping or diversion of sewage flows, pre-installation procedures, rehabilitation of existing sanitary sewer services by lining existing pipe, re- establishing connections to existing sewer main, initial and final CCTV inspection, and final testing of the CIPP system, the restoration of any utilities, parkways, trees, shrubbery, culverts, fences, and other items not covered under subsequent items disturbed by construction operations; backfilling and removal of excess excavated materials; and testing