The furnishing, installing, and testing of approximately 2,405 linear feet of cured-in-place rehabilitation lining of existing 24” sewer lines, approximately 1,025 linear feet of existing 21” sewer lines, rehabilitation and epoxy coating for approximately 34 manholes, cured-in-place lining of existing 4” and/or 6” sewer services and appurtenances; approximately 430 linear feet of new 8” PVC sewer main by open cut method and new 4’ diameter manholes; reinstatement of 4” and/or 6” sewer services; 4” and/or 6” epoxied-on-saddles with stainless steel bands, sewer service clean-out assemblies and traffic rated clean-out boxes (if ordered), point repairs, including unclassified excavation, handling wastewater flows, backfill, tie-ins, reconnections, working in State Highway(s) and city streets, working in close proximity with other utilities and structures, testing, materials testing, restoration, asphalt pavement trench repair, and maintenance, and all other appurtenances.