Project Description Interior renovation including new finishes; furniture; reconfiguration of space within the current moveable furniture guidelines; associated mechanical, electrical, plumbing, and data upgrades; new building automation system; and all required related work. Designer Scope Replace interior finishes and casework, replace all plumbing fixtures, replace HVAC control system; modifications to electrical, lighting, mechanical, and plumbing, as needed, to accommodate new layouts. Multi-story main lobby, Commissioner suites, and public restrooms will require a higher level of upgrades, including specialty lighting. All audio-visual, telecom, and furniture to be coordinated with the State's standards. Construction to be phased with employees remaining in the building, but relocating to other areas, or floors, as necessary.