Specifications include, but are not limited to: 1. Adequate staging and assembly area for the chairlift manufacturer’s use. 2. Containers, material, and labor to load and unload carriers at the acceptance test. 3. Coordinate temporary power and telephone service with the electrical contractor. 4. Electric and telephone service to a work site of the chairlift manufacturer’s selection. Utility charges shall be paid for by the chairlift manufacturer. 5. Tower pads, evacuation equipment, and fire extinguishers. 6. Electric power, transformer, and power connection to the main disconnect at the lift operator’s control building. 7. Provide main power disconnect of appropriate size in the lift operator’s building for incoming 480 v., 3 phase power. 8. Provide and install tower lighting on each chairlift tower. 9. Reseeding and revegetation of disturbed areas of the site, see General Notes and Erosion Control Notes in plans.