Specifications include, but are not limited to: 1) Meet with the project’s technical panel to review the project scope and work plan. 2) Interview select SDDOT staff regarding the purpose and need for the SDDOT Annual Report and potential themes and content for the FY2019 edition. 3) Based on information gleaned from the interviews, propose to the project’s technical panel potential themes, format, content, and sources for needed content for the FY2019 edition of the SDDOT Annual Report. 4) Upon agreement on theme and overall content, prepare and present for review and approval of the project’s technical panel a richly annotated outline, a list of verified sources for article content, and a preliminary layout for the FY2019 edition of the SDDOT Annual Report. 5) Upon the panel’s approval of the outline, content, and layout compile content from within the agency, create original content, and design, compose, edit, and lay out the draft FY2019 edition of the SDDOT Annual Report for review and approval of the project’s technical panel. 6) Upon approval of the draft, compose the FY2019 Annual Report in an electronic format suitable for publication and distribution by SDDOT.