Specifications include, but are not limited to: Plugging Requirements 3.2.1 Set cast iron bridge plug at 2,661 feet and dump bail five (5) sacks of cement on top of plug, or spot thirty (30) sacks across perforations. Wait for eight (8) hours then tag the plug. 3.2.2 Spot thirty (30) sacks balanced plug in casing at 2,150 feet. 3.2.3 Perforate at 1,980 feet, set cement retainer at 1,880 feet and pump forty (40) sacks cement through retainer, spot ten (10) sacks on top of retainer. 3.2.4 Spot thirty (30) sacks balanced plug in casing at 1,300 feet. 3.2.5 Spot thirty (30) sacks balanced plug at 750 feet. 3.2.6 Perforate at 278 feet, set cement retainer at 178 feet, pump forty (40) sacks of cement through retainer, spot ten (10) sacks on top of retainer. 3.2.7 Spot seven (7) sacks from fifty (50) feet to surface. 3.2.8 Remove all equipment, cut casings off four (4) feet below ground level. Weld on plate with weep hole, inscribe well location information on plate. 3.2.9 Reclaim the well site in accordance with state reclamation requirements found in ARSD 74:12:03:06. 3.2.10 Cement volumes are based on cement with 1.15 cubic feet per sack yield. Volumes must be adjusted accordingly if cement with a different yield is used.