1. Provided the PURCHASER has paid for timber as required in Section II.B.2 ADVANCE STUMPAGE PAYMENT, the PURCHASER has the right to cut and remove timber from the sale area provided all Contract requirements related to the commencement of operations have been met. 2. All right, title, and interest in and to any Included Timber shall be retained by the USFS until: a. The timber has been paid for, b. The timber has been measured, as described in Section III.A PRODUCT MEASUREMENT. c. The timber has been properly marked, branded and ticketed as described in Sections III.C LOAD TICKETS & E LOAD MARKING. 3. Title to timber remaining on the gross sale area at termination of the contract shall remain with the USFS. 4. As documented in this contract, or otherwise agreed to, all roads and other improvements become the property of the USFS as they are constructed.