Specifications include, but are not limited to: evaluate the surface smoothness on a lot basis. A lot is defined as a single paved lane, 12 feet wide, and 0.10 mile long. Pavement sections less than 0.10 mile long will be tested, the results will be combined with the previous adjacent lot, and the average IRI and price adjustment will be prorated. If the section is less than 0.10 mile long but at least 200 feet long and not adjacent to a previous lot, the average IRI and price adjustment for the section will be evaluated individually and prorated. • The Contractor has completed all AC paving in the area to be profile tested; • The Contractor has cleaned the surface of debris and other obstructions and has completed necessary sweeping; • The Contractor has placed necessary traffic control devices; • The ambient air temperature is at least 40°F but not above 100°F; and, • Rain and other weather conditions determined inclement by the Engineer are not present. Construction Stakes, Lines and Grades; Public Convenience and Safety; Roadway and Drainage Exc. & Emb; Timber, Prestressed, and Steel Piles; Undercutting Pipe & Plate Pipe.