Specifications include, but are not limited to: Travelers Rest recently completed Downtown Master Plan includes reimagining Gateway Park with a central lake feature that will create a passive park experience and green infrastructure for the downtown redevelopment. A feasibility study for this project, including lake design and consideration of stormwater concerns within the natural drainage area and outside the park site should be included. Travelers Rest currently experiences flooding along Main Street (US Route 276) and Center Street during significant rain events. Phase 1 tasks shall include, but are not limited to the following: 1. Coordination of a kickoff meeting and site reconnaissance visit 2. Perform a Feasibility Study for the lake feature and stormwater mitigation. Greenville County LIDAR is proposed to be used in this phase of work. This study will take into account maximum development for the downtown area in Travelers Rest. Activities include the following: a. Basin analysis and drainage study b. Utility inventory including stormwater, sewer, electric, gas, water, communication, and roadway c. Lake feature feasibility