Specifications include, but are not limited to: he office, technician house, and agricultural shed/shop all currently share a common well. We desire a new 4” well to be installed and used in the same manner due to frequent loss of pressure and other issues associated with existing well. This well will have the capability of providing adequate water to the office, technician trailer, and the shop/shed (filling 200-300 gallon sprayer tanks). All new components will be housed in the existing pump house where current well is located minus the well head. New well head will be covered (lumber constructed well house or pho-rock cover) and insulated adequately. New well will be connected to piping at old well. Old well will be kept in place and functional to use as emergency or additional water source.