Specifications include, but are not limited to: a. Structural Controls and Storm Water Collection System Operation: The operation of the storm sewer collection system, storm water conveyance system, outfalls, structural controls, Best Management Practices (BMPs) for quantity and quality control, etc. shall be maintained in a manner to reduce the discharge of pollutants to the Maximum Extent Practicable (MEP). b. Areas of New Development and Significant Redevelopment: A comprehensive master planning process must be in place to achieve the "MEP" standards to reduce the discharge of pollutants, after construction is completed, from MS4s which receive discharges from areas of new development and significant redevelopment. c. Existing Roadway: All roadways shall be maintained and operated in a manner to reduce the discharge of pollutants to the "MEP". This includes paved and unpaved roadways.