Specifications include, but are not limited to: • Replace all damaged wood siding, trim, and soffit. • Prep, stain, and paint all exterior wood work. • Remove existing garage door and existing French door unit. • Install 2-3/0 Exterior Door units.( Doors to be 9 lite and out-swing doors w/deadbolts) • Install 6-36” x 48” new construction vinyl windows. ( install a min. of 10” framing header above window) • Remove existing shingles and replace with new Architectural shingles. • Install rough-in plumbing for 2 restrooms, 1 kitchen sink, and 30 gallon water heater. (includes cutting and repairing of concrete slab) • Install, finish, prime and paint ½’ drywall on all interior walls. (Owner to frame interior walls) • Install rough-in electrical for all needed lights, receptacles, and appliances. SPECS Paint • Contractor will coordinate with owner on confirming the color. • Stain to be Sherwin-Williams Woodscapes Solid. • Caulk to be siliconized acrylic latex and match the color of the stain. Siding and Trim, • Spacing for all fasteners shall be per manufacturer’s specs. • All exterior fasteners to be galvanized. Windows • Thermastar by Pella new construction • Single Hung • White Doors • Fiberglass, 9 lite, out-swing, lock and deadbolt bore. Roof • GAF Timberline HD Charcoal Laminate Architectural Shingles w/ Ice and Water Shield underlayment.