Specifications include, but are not limited to: Contractor will perform work on both the Fort Mill High School lacrosse field and the Sugar Creek Elementary School general sports field. Contractor will supply, unload, and install steel poles and sports lighting equipment All poles will include pole steps, safety cables, and catwalk/maintenance platforms. Contractor is responsible for excavation of all light pole/base holes. All poles must be rated for wind loads of 90 MPH, per York County. Contractor will trench and install all cable in conduits w/ copper conductors to each pole via trenched ditches. Contractor to provide all equipment necessary to receive, assemble, and erect new poles and sports lighting. Contractor will backfill all ditches, tamp all affected areas, ensure the areas are level to prevent tripping hazards, and seed and straw same areas. Contractor will install new outdoor service panel w/ contactor cabinet for controls w/in 50 feet of the field.