Specifications include, but are not limited to: The purpose of this project is to improve drainage conditions for the existing residential development located along Running Water Road as well as side street connections in Georgetown County, South Carolina. This project is linear in nature and consists of approximately 3,500 linear feet of new drainage infrastructure improvements along Running Water Road and behind some of the lots located on the road. Existing stormwater infrastructure will be removed as part of the project and regrading of ditches and the installation of a new pipe system within the right-of-way will occur. Existing stormwater pipes will be replaced in the right-of-way and the ditches and new pipes will provide positive drainage conveyance to the current and existing drainage outfall pond located at the far West end of Running Water Road. This pond outfalls to a concrete headwall with an overflow control structure located on the east side of LaBruce Lane and this project includes modifications to this existing weir. The project includes 54 new drainage structures, re-paving of roads and driveways, fine grading of ditches, and utility relocations.