Specifications include, but are not limited to: A. Provide all access and site protection for work. B. Provide all submittals, samples, shop drawings, and mockups required by Project Specifications. C. Removal and disposal of any plywood or other protection currently covering windows. Remove sash to be repaired offsite and install temporary plywood protection over removed sash. Implement lead and asbestos abatement measures required by federal, state, and local laws during removals. D. Removal and abatement of all unsound paint from sash and exterior frames. E. Removal and abatement of all existing glazing. F. Removal, stripping, and reinstallation of existing interior hardware. Replace missing latches and pulls to match existing as required. Remove and dispose of abandoned exterior hardware and patch resulting holes in sash and/or frames. G. Replacement of missing or broken glass to match existing. Cleaning and reinstallation of sound, existing glass. H. Repairs to deteriorated wood sash including consolidation, replacement of elements in kind, splicing repairs, and patching as required.