Specifications include, but are not limited to: Item 1: Front porch: Remove existing aluminum guard rails and hand rails. Install new handrails and pickets per code. Use screws for all fasteners. Install P/T posts. Install new PT top rail cap (5/4 material). Install new PT top rail 2”x4”. Install new PT bottom rail 2”x4”. Install new PT pickets 4” max spacing. Install 1 ½”- 2 ¼” rounded handrail inside of top rail both sides. Item 2: Side entrance steps: Side steps install handrails both sides. There is an existing painted handrail on one side re-use posts. Use screws for all fasteners. Install P/T posts. Install new PT top rail cap (5/4 material). Install new PT top rail 2”x4”. Install new PT bottom rail 2”x4”. Install new PT pickets 4” max spacing. Install 1 ½”- 2 ¼” rounded handrail inside of top rail both sides. Item 3: Front door: Weatherize door to eliminate air infiltration by but not limited to installing new weather stripping, bottom door seal and door adjustment. Item 4: Bathroom floor: Bathroom floor is approximately 5ft x 5’ 7”. Floor is weak around the toilet. Do not remove tub. Remove and dispose of ALL linoleum and ALL deteriorated wood flooring. Install floor joist blocking as needed (the same sized dimensional lumber as floor joist) to provide a fastening surface for sub floor patch. Insure patch is the same height as the surrounding floor. Fill all joints and fasteners divots to insure smooth continuous flooring. Install new linoleum (Vinyl Sheet Flooring: a minimum of 2MM thick) customer to choose design/color. Insure watertight seal around tub. Install new transition strip under door.