Specifications include, but are not limited to: MOBILIZATION 1.000 LS BONDS AND INSURANCE 1.000 LS TRAFFIC CONTROL 1.000 LS BORROW EXCAVATION 2,867.000 CY EXCAVATION FOR SHOULDER PAVING 1,023.000 STA HAULING OF EXCAVATED SHOULDER MATERIAL 1,023.000 STA MAINTENANCE STONE 145.500 TON HMA SHOULDER WIDENING COURSE 4,528.127 TON LIQUID ASPHALT BINDER PG64-22 1,097.945 TON FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 10,750.000 SY MILLING EXISTING ASPHALT PAVEMENT 2.0" 136,181.000 SY MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 2,440.000 SY MILLED-IN RUMBLE STRIP 19.300 MI HOT MIX ASPHALT SURFACE COURSE TYPE B 16,028.448 TON DRIVEWAY PAVING-SURFACE TYPE B 415.625 TON ASPHALT SURFACE TREATMENT (DOUBLE TREATMENT) TYPE 4 136,181.000 SY PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 640.000 SF 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 796.000 LF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 407,680.000 LF 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 704.000 LF 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 36,840.000 LF 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 373,900.000 LF 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 199.000 LF 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 101,920.000 LF 24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 176.000 LF