Specifications include, but are not limited to: 1. Prepare all areas that will receive new flooring. Reference Attachment 1 - Layout & Plans. The previous flooring has been removed and disposed of by the County, except in areas that had ceramic tile. The contractor will be responsible for removal and disposal of any ceramic tile. 2. Provide and install carpet in the areas outlined. For standardization purposes, carpet shall be Shaw Cutaway Style J0181, Color 81402 – Roll to match the other areas in the HSB. 3. In carpeted areas, contractor shall provide and install 4” black vinyl cove base. 4. Provide and install porcelain wood-style tile to match the other areas in the HSB. Exact specifications will be provided for the tile. 5. The grout in the tiled areas should be Ground Coco by R-Dex. Rather than cove base in the tiled areas, contractor shall use one tile along wall edge, as done in the other areas of the HSB. 6. There is one bathroom on the lower level floor which has a ceramic wet wall. These wall tiles shall be removed and replaced with MyStone Unpolished Gray 8" x 15 3/4" using MAPEi - Wall Grout in Unsanded Pewter. 7. Obtain permitting and business license from the Town of Summerville. 8. Ensure finished work meets county’s approval. 9. Remove all debris left over. 10. Any change orders not in the scope or agreed upon prior to work beginning must be approved before it is started. 11. All work must meet all electrical and building code standards.